
Share this story
At É«¿Ø´«Ã½, we're building infrastructure tailored for high-density computing and scalable power solutions for our client NEXTDC.
We worked closely with NEXTDC during the design stage to ensure M3 Stage 2 and Stage 4 are built to the highest standard and meet the demands of accelerated AI workloads with exceptional scale and speed.
Six tower cranes now soar above our two sites, as Stage 2 nears top-out.
The scale and the speed at which we're building Australia's digital future comes into full view in this drone footage.
Developer: NEXTDC
Superintendent: Newbridge
Architect: HDR
Structural Engineer: INNOVIS Consulting
Services Engineer: ADP Consulting/Arup
Building surveyor: Du Chateua Chun
We worked closely with NEXTDC during the design stage to ensure M3 Stage 2 and Stage 4 are built to the highest standard and meet the demands of accelerated AI workloads with exceptional scale and speed.
Six tower cranes now soar above our two sites, as Stage 2 nears top-out.
The scale and the speed at which we're building Australia's digital future comes into full view in this drone footage.
Developer: NEXTDC
Superintendent: Newbridge
Architect: HDR
Structural Engineer: INNOVIS Consulting
Services Engineer: ADP Consulting/Arup
Building surveyor: Du Chateua Chun
Latest News

Motorway Control Centre - Project Win
É«¿Ø´«Ã½ is proud to be delivering the Motorway Control Centre (MCC) as part of the North East Link – Victoria’s largest road infrastructure project.

High St Preston - Topping Out
We just celebrated topping out at our High St, Preston project. This 18-storey build-to-rent tower will be a landmark development in the heart of Preston.

Project Completion at Yarra Valley Grammar
We recently completed the new Dr Mark Merry Performing Arts and Media School at Yarra Valley Grammar.